EOLE STAB at the Floating Offshore Wind Turbines (FOWT) 2023
Join us at the networking area at La Cité Nantes Congress Centre in France. Floating offshore wind is opening new possibilities for wind power locations and will play a critical role in the transition to a cleaner energy supply, contributing significantly to an increase in offshore wind power. According
Why Eole Stab choses concrete over steel?
EOLE STAB can choose to make the caisson of its platform in steel or concrete, but it prefers concrete for several reasons. First, concrete offers intrinsic characteristics such as its resistance to corrosion. In addition, thanks to its higher mass than that of steel, concrete allows lowering the center o
Feedback on 3DR® Formwork: Eric TRICHET, Chantier MERCEDES
Eric TRICHET, from the MERCEDES construction site, answers our questions. 1. What were the competing systems for the construction of the cone? We had several alternatives for the construction of this fairly complex structure: Sprayed concrete,Traditional formwork,Precast walls,3DR formwork structure. 2. W
Feedback on 3DR® Formwork: Patrick LABUSSIERE, Spie Batignolles
Patrick LABUSSIERE, SCGPM, Spie Batignolles, answers our questions about the TDF construction site carried out with Dipy formwork. The DIPY formwork was invented by the same people who developed the current 3DR. As a user of both versions, we would like to hear your impressions on these two technologies.
Feedback on 3DR® Formwork: Armand CORVIOLE, ITALCEMENTI GROUP
Armand CORVIOLE, Marketing Director for Cement-Concrete in France and Belgium, ITALCEMENTI GROUP. At the request of Philippe DURAND, Unibéton has contributed to the candidacy led by Coffratherm for the 3DR process in the European project since 2000. Unibéton is the Italcementi Group company responsible