Feedback on 3DR® Formwork: Eric TRICHET, Chantier MERCEDES
Eric TRICHET, from the MERCEDES construction site, answers our questions. 1. What were the competing systems for the construction of the cone? We had several alternatives for the construction of this fairly complex structure: Sprayed concrete,Traditional formwork,Precast walls,3DR formwork structure. 2. W
Feedback on 3DR® Formwork: Patrick LABUSSIERE, Spie Batignolles
Patrick LABUSSIERE, SCGPM, Spie Batignolles, answers our questions about the TDF construction site carried out with Dipy formwork. The DIPY formwork was invented by the same people who developed the current 3DR. As a user of both versions, we would like to hear your impressions on these two technologies.
Feedback on 3DR® Formwork: Armand CORVIOLE, ITALCEMENTI GROUP
Armand CORVIOLE, Marketing Director for Cement-Concrete in France and Belgium, ITALCEMENTI GROUP. At the request of Philippe DURAND, Unibéton has contributed to the candidacy led by Coffratherm for the 3DR process in the European project since 2000. Unibéton is the Italcementi Group company responsible
3DR® Structural Formwork
3DR® Structural Formwork is a hand portable formwork used to carry out reinforced concrete works, it allows to reduce not only construction sites constraints and risks, but also the time of completion of the works.
An innovative solution for complex architectural design
The 3DR® Structural Formwork is flexible. Its prefabrication makes possible the realization of complex architectural form (S curves, slopes, ...
The ultimate guide to our construction applications
For all types of veils, insulated or not, for all structures in "building" concrete, for all structures in "public utility" concrete...
Our history
With over 30 years of expertise in the structural formwork and building industry..